Remanufactured Rear Subframe kit for L322 KHE500050
£1,599.00
Remanufactured Rear Subframe kit for L322 KHE500050, Early version for manual handbrake.
Available on back-order
Description
Remanufactured Rear Subframe kit for L322 KHE500050, Early version for manual handbrake.
For the later version, electric handbrake use this link; https://stevessteel.co.uk/product/remanufactured-rear-subframe-kit-for-l322-khe500050/
A kit containing the following;
- 1 off Re Manufactured Rear Subframe; KHE500050
- 4 off Re Manufactured wishbones
- 2 off Re Manufactured rear uprights/hub carriers
Fitted with new bushings and bearings.
Note; subject to supply some parts listed as remanufactured may be supplied new, some bushes may be salvaged.
Our remanufactured rear subframes, wishbones and hubs start with a search through salvage of late model L322 cars, when we find a suitable donor we pressure wash and strip the subframe of all its component parts.
Every part removed is inspected and the good parts are sent for pyro bake and sand blasting before returning to us for further inspection, modification and repairs if necessary.
The subframe is then powder coated RAL 7016 Anthrasite satin. (other colours available to special order)
When it returns to us we fit new bushings and bearings before a final check and packing for despatch.
All parts are supplied as an outright purchase.
IMPORTANT NOTE; By default you will be supplied with a subframe for the manual handbrake version cars. If your car has an electric handbrake please add a note to your order and I will respond with the lead time for you.












Darren Slade –
Hi Steve, was wondering where your based
Steve’s Steel –
Hi. We are in Ripon in North Yorkshire but keep an eye on the contact page as we are moving to Wales soon.
Dakarayi Mtisi –
Hey Hello,
Do you have the subframe but for the Disco-3
Steve’s Steel –
Sorry, I only do parts for the L322.
Lee Dobson –
Hi there, what is the eta for Remanufactured Rear Subframe kit for L322 KHE500050 with manual handbrake?
do you use a carrier to ship out?
Im based in Dorchester?
Thanks
Steve’s Steel –
Hi Lee.
Lead time at the moment is about 6 weeks and will be shipped on a pallet to you when its ready. Hope that helps?